This 15 unit (single building) condominium
building incurred very extensive structural rot damage. The
complete exterior stucco system was removed, re-designed, and
replaced. Major structural repairs were performed during
the process. Complete window replacements were also included.
All work was inspected, designed, and directed by qualified structural
engineers.